• Waterborne Glass Paint with Super Strong Dry Film Adhesion
  • Waterborne Glass Paint with Super Strong Dry Film Adhesion
  • Waterborne Glass Paint with Super Strong Dry Film Adhesion
  • Waterborne Glass Paint with Super Strong Dry Film Adhesion
  • Waterborne Glass Paint with Super Strong Dry Film Adhesion
  • Waterborne Glass Paint with Super Strong Dry Film Adhesion

Waterborne Glass Paint with Super Strong Dry Film Adhesion

Usage: Decorative Glass, Vessel Glass, and Flat Glass
Color: Colorless to Yellow Transparent Liquid
Appearance: Liquid
Method: Roller
Main Raw Material: Acrylic Resin
Level: Finish Coat
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
BLK-1132
Substrate
Glass
Expiration Date
1 year
Packaging
Plastic Drum
Storage and Transportation Temperature
5ºC~40ºC
Specification
200kg/drum
Trademark
Kinno
Origin
China
Production Capacity
10000tons/Year

Product Description

Waterborne Glass Paint with Super Strong Dry Film AdhesionWaterborne Glass Paint with Super Strong Dry Film AdhesionWaterborne Glass Paint with Super Strong Dry Film AdhesionWaterborne Glass Paint with Super Strong Dry Film Adhesion
Technical Data Sheet
Test items   Standard Instruction
Hardness H ≥3 High hardness and high gloss are the biggest characteristics
Gloss (60 °) % ≥100
Adhesion level 0 Can pass the 100 grid test and can be scraped with nails
Resistant to yellowing   but not yellowing  
Water resistance   7 days Normal temperature water, no abnormalities
Boiling water resistance (100 ºC)   60 minutes Slight whitening after drying, no abnormalities after drying
Dishwasher resistance test Times 5-15 To pass the dishwasher test, a sealant must be added
Salt spray resistance H No abnormalities within 96 hours  
Acid resistance (5% HCL) H No abnormalities within 2 hours  
Black paint density Kg/L 1.35  
Performance indicators: (Bake at 180 ºC for 20 minutes, test performance after 8 hours)
Disclaimer:
The information contained in this technical instruction is real and for users' consideration and test reference only. In the view of actual conditions of usage, storage and handling are being totally beyond our control, customer should evaluate the data and product and make their own tests to determine the suitability of our product for their respective use in full scale production for his own purpose and under his operating conditions.

Product performance and advantages:

1132 series adopts water-based acrylic resin and amino group, which are baked and cured at high temperatures (150 ºC~180 ºC) to form a film. The paint film has high gloss, high hardness, high scratch resistance, strong dry film adhesion, good water resistance, good acid and alkali resistance, and high cost-effectiveness. Multiple methods such as roller coating, spray coating, and spray coating can be used for construction. Suitable for various standard requirements such as decorative glass, vessel glass, and flat glass.

Precautions:

1. Cleaning glass: Before cleaning the glass, first mix the water paint with 10%, sealant 2%, and BL88%, and then clean the glass with a film washing machine. The surface of the glass should not have any residual cleaning solvent.

2. Roller coating or spray coating: Adjust the machine parameters reasonably according to the glass thickness and customer requirements.

3. Baking conditions: The temperature of the tunnel furnace is set at 180 ° C (actual furnace temperature), and the oven is baked for 15-20 minutes. The bread oven can be set between 120 ° -180 °, and the baking time is about 30 minutes.

4. Cooling conditions: Glass can be cooled at room temperature or with a fan, but remember not to use cold water to get wet and cool down. Glass must not overlap before cooling to room temperature to avoid scratching the glass paint surface.

5. Packaging and post-processing: Different packaging forms can be selected according to different industries, but regardless of the method, it is necessary to ensure that the water paint is fully dry and the glass is cooled; In the subsequent process, it is necessary to conduct corresponding tests (such as glue resistance, water boiling, heat resistance, etc.)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
15
Year of Establishment
2011-07-26